Construction Enterprises' AI Initiatives

This white paper is a practical action guide tailored for the construction industry, helping enterprises unlock a new model for delivering better buildings with Industrial AI.

Learn More
01
05
bg-bg-left

We use TAS, TRB, TBQ for this project. It takes about 1 month.Our feelings are as follows: 1. We build the TRB model first, then import to TAS; import BQ into TBQ, connect TAS & TRB with TBQ, link the quantity of the corresponding entity with the BQ item, and compare the contract BQ with the actual quantity quickly. Save us lots of time! 2.The structural drawings of this project use China's flat construction drawings, and the efficiency of TRB modeling is still high. The intuitive rebar 3D make us to check easily.

Edwin Chen/Tan mi/Xuling

Edwin Chen/Tan mi/Xuling

Quantity Surveyor Giant Leap Construction

Digital Building Summit 2025

Digital Building Summit 2025

May 16.2025 - May 17.2025   08:00 - 11:30   GMT + 8
Offline
Join Glodon at QSApex 2024 for Groundbreaking Insights into 5D BIM

Join Glodon at QSApex 2024 for Groundbreaking Insights into 5D BIM

Oct 05.2024 13:00-20:00   GMT + 8
Offline