Sinopec Lubricant (S) Pte. Ltd.
Tuas, Singapore
-
Project Type & Description: Industrial Building
-
Glodon Products Involved: TAS&TRB
Sinopec Lubricant (S) Pte. Ltd.
Project Location:
Tuas, Singapore
Project Type:
Industrial Building
Project Overview:
Additions and Alterations to Existing Single User Industrial Development Involving A 3-story warehouse Space extension to existing Black 140 on Lot 04349T MK07 at no.150 Tuas South Avenue 5.
Client:
Malayan Daching Co Pte Ltd
One of the most established Building & Engineering Construction Company
Core Benefits:
Maximised Work Efficiency and Productivity
After using Cubicost Solutions, it turns quantity takeoff easier to manage and faster to complete. It also helps to save time and able us to complete the projects in a shorter period of time spend.
Seamless Collaboration and Communication
Cubicost Solutions connects the BIM models, the scheduling data and the cost data in real-time. Hence it allows all our project stakeholders to access the model whenever they need to. This also helps to reduce error and allows better communication to the project stakeholders.
Better Cost Estimation Results
Cubicost Solutions allows us to generate automated quantities from 3D models. This function helps to save time and is also able to provide accurate estimation results. Calculations are also updated automatically with changes are made in the Cost data and quantities are live-linked.
Mr. Gao Li, QS of Malayan Daching Co Pte Ltd :
"I was impressed by Glodon team and the Cubicost Solution. With all the smart features and automation in the Cubicost solutions, it helps us generate more accurate results quicker thus it helps to save us a lot of time compared to the traditional method. Glodon also provides top-notch service, as they are responsive and supportive whenever we faced any issues."
