Home > references >Singapore Institute of Technology Campus
  • detailsa-left1

    Singapore Institute of Technology Campus

  • detailsa-left2

    Punggol, Singapore

  • Project Type & Description: Institutional Building

  • Glodon Products Involved: TAS&TRB

Singapore Institute of Technology Campus

Project Location:

Punggol, Singapore

Project Type & Description:

Institutional Building

Project Overview:

Expected to be completed in 2023, the 91,000 square meter project comprising a 10-Storey Administration Block, Part 1/4/6/9-storey Academic Blocks, Basement Car Park and other Ancillary Facilities. It is located in an existing forest, which will create a “Campus in a Park” experience.

Client:

Kimly Construction Pte Ltd
Well-Established Award-Winning Company

Core Benefits:

Improve Cost Estimates Accuracy

With local build-in rules, quantity surveyors will easily generate automated quantities from BIM-based 3D models. For estimation, Cubicost 5D BIM platform allows the automation of all the predictable, repetitive calculations and assignment tasks required for cost estimation. This improves the overall accuracy of estimation, saving time and effort while standardizing the whole cost estimation process.

Communication & Collaboration

It supports teams to work independently and collaboratively. Consequently, the BIM models, the cost data and scheduling data are all connected in real-time, and the processes are automated into various details, enhancing the collaboration between the quantity surveyors, estimators and planners with the whole project team.

Reduce Manpower & Cost

5D BIM connects the cost factor to a 3D model which improves the overall cost estimation process, the smart cost estimation process and high accurate QTO results will lead to significant cost and manpower savings.

Better Insight Into The Project

With Cubicost, taking BIM beyond the design phase into the project tender stage and construction phase. The calculation can go to the object level, be presented in BIM models, and exported in different levels of detail to facilitate decision-making.

Ms. Cheng Ean Peng, Senior QS of Kimly Construction Pte Ltd :

"Moving away from traditional measurement methods and throwing away excel and highlighters, with Cubicost 5D BIM Cost Management Solution enabled us to centralize all project information in a single, cloud-based platform which allowed us to work from home collaboratively and improve the whole project efficiency. Thank you Glodon for making the digital QS profession possible in the journey toward digitalization."