G215 Liuyuan-Dunhuang Expressway Project
Gansu Province, China
-
Project Type & Description: Expressway, with annual traffic 25,902pcu / d
-
Total Investment: CNY 2.7 billion (approximately 0.42 billion USD)
-
Gross Length: 46 km² mainline & 29 km² side road
-
Design Institute: CCCC Second Harbor Consultants Co., Ltd
-
Glodon Products Involved: Eroad Suite, InfraFuser design management platform, collaborative design management platform
BIM Sustains a Green Silk Road in the New Era
The project is located in Guazhou County, Jiuquan City (Dunhuang City), Gansu Province, the west of the Hexi Corridor in China, a vital Road route and a significant component of Xining-Korla Highway of the China Western Passage. The main line spanning 46 km² and the side road 29 km². The gross investment amounts to CNY 2.7 billion (approximately 0.42 billion USD) and the annual traffic reaches 25,902pcu / d.
The project will pass through lots of natural reserves and cultural relics, with complex crossing high-voltage lines. Thus, high-level line selection and construction abilities are required. The application of BIM technology in designing the expressway has helped the project win the BIM Engineering Innovation Award of the China Highway and Transportation Society in 2019.
BIM Planning
i. Project Objectives
Utilized advanced BIM technology to overcome difficulties, for instance,
ii. BIM Application Planning---Project Objectives
iii. BIM Application Planning
Project Team: There are a total of 20 members in the team, involving 9 specialties, including routes, roadbeds, bridges, etc. who work collaboratively.
Highlights of BIM Application
i. Real Photograph
The application of real image generation makes the topology more reasonable.
ii. Application of Integrated Various Software
Integrate traditional designing software and BIM software.
iii. Output of Figures in Batches and Accurate Project Quantities Takeoff
iv. Easily integrated with the other platforms and can be easily accessed through different devices
v. BIM Encoding
Apply the BIM encoding system based on the BIM data
vi. Simulated Disclosure of Technology Schemes
Simulated presentation of technology schemes with BIM
Key Insights
i. BIM Collaborative Design
In this project, an entire BIM collaborative approach was adopted to establish a central model file and corresponding models of different specialties, which will then be gathered with the central file repository and integrated together.
ii. Benefits of the BIM Project
This project harbors the characteristics of large volume, lean management, strict requirement and high controlling. With BIM collaborative design, lean models such as LOD300 roads and stairs of BIM standard were built. The design time was greatly shortened, with design errors reduced by 15% and efficiency improved by 30%.
iii. Design Management Based on the Collaborative Design Cloud Platform
Different from regular BIM applications at the project level, this project adopts BIM design cloud platform and integrates manufacturing management and quality evaluation and control system of the enterprise, which has conspicuously facilitated the level and results of BIM design.
@Copyright credit to CCCC Second Harbor Consultants Co., Ltd
Brief Introduction of Project Designer:
CCCC Second Harbor Consultants Co., Ltd was founded in 1958. Located in Wuhan, Hubei Province, it is the wholly-owned subsidiary of China Communications Construction Company. The company obtains certificates of Class A level including Class A Engineering Designing Certificate for comprehensive Category, Class A Engineering Investigation Certificate for comprehensive Category, Class A Surveying & Mapping, Class A Surveying & Mapping for maritime, Class A Engineering Consultation, Class A Engineering Cost Consultation, Class A Environmental Impact Assessment (EIA) and Class A Waterway Engineering Supervision. It is the research and development center of BIM technology of China Communications Construction Company.