    Glodon Rebar Takeoff Application (Hospital)

  • detailsa-left2

    1 Mandalay Road, Singapore

  • Project Type & Description: Hospital

  • Gross Floor Area: 40,658.57㎡

  • Total Construction Period: 205 Calendars Week

  • Glodon Products Involved: TAS, TRB

Catering to QS Rules Based on Singapore Method of Measurements

Project Description

Location: 1 Mandalay Road, Singapore

Type: Hospital

Floors: 10 Floors + 2 Basement

GFA: 40,658.57 ㎡

Duration: 205 Calendars Week

  

Comparison

Priorities and Difficulties in QS' Manual Calculation

1. Time-consuming to analyze and identify

2. Preparation time to set up the excel format

Strength of Software Application

1. 3D view for better visualization and clarity of model designed. Able to capture missing elements easily from 1 look at the building

2. Help us to easily identify the missing elements

3. Auto-generation of quantities for TAS after completion in TRB.